609 Castle Ridge Road, Suite 335, Austin TX 78746. (512) 579-3560

FPP
(%)

FieldPoint Petroleum

Latest News

FieldPoint Petroleum Provides Update

Thursday, July 31st, 2014 and is filed under Drilling and Production Update

AUSTIN, TX – (PRNEWSWIRE) – July 31, 2014 - FieldPoint Petroleum Corporation (NYSE/MKT:FPP) today provided an update on recent activity. Phillip Roberson, FieldPoint President and CFO, stated, “As the Ranger Project continues, we have now completed the third and fourth horizontal Taylor Sand wells in the Serbin Field with our drilling partner, Riley Exploration Group, LLC. The first Ranger well, the 8A-1H, was completed in the 1st quarter of this year to a total vertical depth of 5,269’ and a total measured depth of 11,500’ with an initial production rate of 167 barrels of oil per day (BOPD).  We are pleased with the performance of the well, but believe we have a blockage in the lower perforations and plan to work over the well later in the year with expectations of increasing production.  The second Ranger well, the 11A-1H, was completed in May to a total vertical depth of 5,679’ and a total measured depth of 9,500’ with an initial production rate of 231 BOPD.  This well had a much shorter lateral than the first well, but as we continue to improve our completion plan, we believe the wells will continue to improve.  The third and fourth Ranger wells, the 8A-2H and 8A3-3H, were recently completed utilizing the same pad and production facilities used for the 8A-1H. These two recent wells are currently flowing back, and from results to date, we believe they will perform as well or better than the first two wells.” Read More

Close